Solar for Cement Industry

November 05, 2026 | Satya Narayan Pandey | 8 Min Read

The cement is one of the hardest to decarbonise. Due to having numerous high power consuming processes, such as crushers, raw mills, cement mills, fans and conveyors which can run for long periods of time, every unit of electricity you’re using needs to be valuable. Although Solar will not play a role in the chemical reaction of clinker, it can help reduce your power costs, reduce your Scope 2 emissions and improve your relationship with customers who want to know their carbon footprint.

Overview

  • Reduce Power Costs: Often cheaper than using electricity from the industrial grid. If you run your plant during the day you’ll be using the majority of it.
  • Reduce Scope 2 Emissions: For every unit of solar you use, you’re reducing the amount of electricity you’re using from the grid. This helps reduce your indirect emissions.
  • Multiple Options: Roof mounted using plant roofs or unused/ buffer land. Can also be purchased using a group captive or open access option.

Why Manufacturers are looking at Solar for Cement Industry

Cement is responsible for approximately 7-8% of global CO2 emissions. The majority of this is due to the chemical reactions involved. When heating limestone, CO2 is released chemically and the kilns burn a large amount of fuel. Solar PV cannot help these issues. However, you will typically have approximately 90-110kWh of electricity used per tonne of cement produced, so this is a great area to make improvements.

There are several reasons why the solar for cement is looking at solar.

  • Power costs are a large expense: Due to the amount of electricity needed to operate cement mills, fans, crushers and conveyors, reducing your power costs will improve your margins.
  • Tighter carbon regulations: The EU CBAM has moved into its definitive stage from 1st Jan 2026. Cement is included within this regulation. Guidance has been published indicating that cement imports require the reporting of direct and indirect emissions. Due to this the solar for cement will be affected by the carbon content of the electricity. Speak to your compliance team to keep up to date on any regulations.
  • Customers and lenders are asking: More infrastructure developments, green building initiatives and finance providers are asking for reduced carbon cement and the data to prove it.

The truth is that solar is just part of the solution for cement. The majority of your emissions will come from fuel switching, alternative fuels, clinker substitution and improving efficiency. However, it is the quickest and lowest risk way to reduce your electricity usage.

How can Solar for Cement be used?

Where is the power used? The main users of power will be your crushers, raw mills, vertical roller mills, cement and ball mills, kiln and mill fans, conveyors, baghouse filters and packing plants. Solar will offset your overall demand so there will be no special wiring.

How much will be used? Cement plants run 24/7 so solar will only be used for a portion of your annual usage. Roof mounted systems are typically only going to give you a small proportion. Ground mounted/large off site projects will give you a large proportion. Speak to us and we can do a study using your load data to give you the true figure.

  1. Will fit with your current power: Many cement plants will have WHRS and captive power. Solar can work alongside this to reduce the amount of units you are taking from the grid or burning in your captive plants.
  2. Grid stability: Having large motors and mills means you will have large start-up and swing loads. This is taken care of by the grid, captive power and batteries (if fitted). Solar will reduce the amount of energy you are purchasing. A good design will include protection and synchronisation studies.
  3. Batteries are optional: They can help reduce your peak demand charges or flatten the generation. However, it will only be viable if you have a tariff that rewards you.
  4. Thermal energy: The heat from your kiln is created by burning fuel. Solar PV will not reduce your thermal energy costs.

Costs of Solar for Cement

  1. Reduced unit costs: Solar is typically cheaper than industrial grid tariffs. This is the majority of the savings you will get. The amount saved on your overall power bill will depend on how much you are covering. Be wary of any fixed percentage guarantees.
  2. Payback period: Many industrial projects in good locations will have a payback period of approx 3-6 years. This will depend on your tariff, system costs, load profile and incentives.
  3. Operating expenditure: If you do not want to invest, you can purchase solar using a PPA or group captive. This means you will pay the agreed price for your generation with little or no upfront costs.
  4. Tax and incentives: Depreciation, state policies and renewable certificates can improve your returns. These are constantly changing and will depend on your tax regime. Get finer details on your business from your CA.
  5. Lifespan: Modules typically have 25 year warranties. Output will degrade slowly, typically around 0.4-0.55% per year. You will need to plan for an inverter change.

Comparing Solar for Cement Deployment Options

Parameter Rooftop solar panels Ground mount solar Off-site (group captive / open access)
Space needed Plant shed and warehouse roofs Spare land, with checks near quarry and mining areas None at your plant
Typical capacity From about 500 kW to several MW, limited by roof area Multi-MW to utility scale Multi-MW to utility scale
Dust and environment Frequent cleaning, anti-soiling measures, caking risk when damp Ground dust suppression, tracker upkeep Developer manages site conditions
Upfront prep Structural check, dust loading review, sealed fixings Land grading, foundations, fencing Contracts and open access approvals
Share of plant demand covered Usually small Moderate to large Moderate to large
Main advantage No land cost, quick to install More kWh per kW, room to expand Large renewable share with low capex
Watch out for Dust caking, roof age, heat near kilns Land permissions, blasting zones Transmission and open access charges, policy changes

Frequently Asked Questions

Q1: Will cement dust have an impact on solar panels?
Ans: Yes. Fine, alkaline cement dust can reduce the efficiency of solar panels, but regular cleaning will help manage losses. Having them at the right angle will also help. Anti soiling, regular cleaning (either by robot or dry) will manage losses in large arrays. Cleanliness should be included in the business case from the beginning.
Q2: Can solar power raw mills and cement grinding units?
Ans: It will reduce the amount of electricity drawn from the grid or generated in captive units. This means it will make up a portion of the total demand of the plant but will not be a standalone source of power for a mill. During night times, cloudy weather and startup spiky loads the grid or captive generation will be used.
Q3: Can solar reduce costs from fuel in my kiln or reduce process emissions?
Ans: No. Heat in the kiln will be supplied by fuels. Cement has a high proportion of CO2 from limestone calcination. Solar PV will help reduce electricity costs and scope 2 emissions, but switching fuels, alternative fuels and clinker substitution will help.
Q4: What is the typical payback period for solar in a cement plant?
Ans: Most industrial projects will have approximately a 3-6 year payback. After this they will generate power for 20+ years. This will depend on the tariff, cost of the system, incentives and the percentage of load being covered.
Q5: Should I install a rooftop or ground mounted system?
Ans: A rooftop will be quicker to install and utilise unused space. However, it will typically only make up a small percentage of the demand of a cement plant. Ground mounted systems or offsite projects will produce a lot more energy. Many plants will start off with a rooftop and add some ground mounted or group captive in the future.
Q6: How does solar complement WHRS?
Ans: Solar works well alongside WHRS. WHRS recovers heat from kiln and cooler gases to create power, solar will provide additional power during the day. This will reduce the number of units being drawn from the grid. A design study should be carried out to ensure it complements the electrical system in the plant.

Get a Project-Specific Cost Estimate

Share This Article

✓

Thank You

Your request has been submitted successfully.
Our team will get back to you shortly.